Bridgepoint Mall

Address
8831 River Rd., Richmond, V6X 1Y6

Contact Name
Nigel Malkin

Contact Phone Numbers
   Work: 604.783.4360
   Fax: 604.904.6774
   Email: nigel@locationscout360.com
   Web: www.locationscout360.com

Parking
Ample

Restrooms (s) available to crew
Yes

Power Available
20 generators worth of production-ready power

Water Available
Yes

Telephone Lines Available
Yes

Space for Catering
Yes

Any Special Considerations to Note
  • Approx. one week demolition of non-supporting structures required before move in to create clear span area (to be deducted from rent).
  • Building lies along flight path for YVR arrivals on sunny days (overcast/rainy day flights generally arrive over water). Arriving flights generate approximately 15 seconds of noise within building. Productions have used this location successfully with a point man to look out for arriving flights.
  • Approx. 20 generators worth of film industry-ready power available.
  • Building plans available. Virtual tour available online.

    Any Off Limits Areas
    No

    Any Special Features to Note
  • 89,000 sq. ft. Building w/ 22,000 sq. ft. + 8,400 sq. ft. of clear span and 58,000 sq. ft. of additional space including offices, workshops, storage, etc. Clear Span Areas:
  • West Building: 60’ x 370’ (40’+ to beam of A-frame roof)(Up to 70’ ceilings in some areas)
  • East Building: 40’ x 210’ (36’+ to beam of A-frame roof)

    Liaison Required
    No

    Description This 89,000 sq. ft. shopping mall, in close proximity to downtown Vancouver, sits in a scenic location on the river next to the Oak Street Bridge. The entire building is vacant and well suited for conversion to film industry use.

    The owner is open to allowing a production company to clear all of the non-supporting structures that line the center of the buildings (cost to be deducted from rent) creating two vast open spaces within the building. The windows can easily be blacked out.

    The main deterrent to Bridgepoint is the sound issue arising from the airport flight path (on sunny days). However, the issue may be overcome with proper organization as an arriving flight generates approximately 15 seconds of noise within building leaving sufficient time for ‘good sound quality’ takes between flights. Come test the sound for your specific needs. If you are looking for a large and versatile production space, Bridgepoint is definitely worth consider

  •  



    panoramic view




    panoramic view




    panoramic view




    panoramic view




    panoramic view




    panoramic view




    panoramic view


    Print Version


                                       

    LocationScout360.com - All rights reserved.
    info@locationscout360.com